Dewar Close, Segnesworth The property consisted of a two storey office block with warehouse previously occupied by an Air Conditioning manufacturing company. The property had been vacant for some time, and had been occupied by travellers who had stripped most of the electrical circuits and pipe work from the building before being removed by the local authorities. The following pictures identify some of the works we carried out on site. External Cleaning To All Of Site Property had two additional mezzanine floors for office space and canteen with underneath testing facilites. These offices and mezzanine floors were removed from the property. We constructed a locker room and canteen with fitted sink and appliances. The top section of canteen was decked out with handrails and fabricated staircase was installed for access. Sprinkler system carried into new canteen and locker room.
All offices were completely stripped and all redundant wiring and services removed. Where required, pipe work and radiators were replaced and new ceiling tiles, grid and carpets were installed. Various offices were constructed from partitioning with intenal blinds to large glass windows. Entire offices were re-decorated throughout. Full structured data cabling installed to property.
The data cabling was wired back to a supplied data cabinet in the constructed communications room. Security shutter was installed with solarfilm and an air conditioning unit. Various pedestrian barriers and traffic barriers were erected inside the warehouse to prevent pedestrian access to traffic areas.
|